Average Foam Sealants Lead Times History
(actual days ex-factory)
| |
Coated Sticks |
UnCoated Sticks |
Reels |
| 2008 |
|
|
|
| January |
3.3 |
1.9 |
2.5 |
|
February |
3.0 |
1.7 |
2.4 |
| March |
3.0 |
1.8 |
3.4 |
| April |
3.1 |
2.0 |
2.5 |
| May |
2.9 |
2.0 |
3.5 |
| June |
3.0 |
3.0 |
2.2 |
| July |
2.6 |
1.8 |
1.9 |
| August |
2.5 |
1.8 |
2.3 |
|
September |
2.0 |
1.8 |
2.0 |
| 2007 |
|
|
|
| January |
3.6 |
2.8 |
2.1 |
| February |
3.5 |
2.9 |
2.0 |
| March |
3.9 |
2.7 |
2.8 |
| April |
3.6 |
2.7 |
3.3 |
| May |
4.1 |
2.9 |
3.8 |
| June |
4.5 |
3.9 |
5.6 |
| July |
4.9 |
3.8 |
3.9 |
| August |
2.9 |
2.3 |
3.0 |
| September |
3.3 |
2.1 |
3.3 |
| October |
4.7 |
3.2 |
3.4 |
|
November |
3.3 |
2.4 |
2.4 |
|
December |
3.4 |
2.8 |
2.5 |
| 2006 |
|
|
|
| December |
2.9 |
2.4 |
1.9 |
| November |
3.3 |
2.2 |
2.0 |
| October |
3.0 |
2.5 |
2.8 |
| September |
2.4 |
2.0 |
2.1 |
| August |
2.6 |
1.9 |
2.8 |
| July |
2.9 |
2.2 |
2.6 |
| June |
3.1 |
2.0 |
2.7 |
| May |
3.6 |
2.2 |
3.4 |
| April |
3.1 |
2.3 |
3.1 |
| March |
3.4 |
4.8 |
2.9 |
| February |
3.5 |
2.9 |
2.5 |
| January |
3.9 |
3.8 |
4.2 |
Glossary:
Coated Sticks:
COLORSEAL,
SEISMIC COLORSEAL,
DSM SYSTEM,
HORIZONTAL COLORSEAL,
DSH SYSTEM
UnCoated Sticks:
20H SYSTEM,
25V,
BACKERSEAL (1
1/4" (30mm) and larger).
Reels:
BACKERSEAL,
25V
(1" (25mm) and smaller). |
|
EMSEAL Factory Lead
Times
EMSEAL is committed to making custom-assembled
orders fast. Our goal is to ensure that the right product, in the
right size, gets to the project in a timeframe that is in sync. with the
construction schedule:
Average lead times:
All foam products* are
averaging
2 business days
ex-factory.
These include:
COLORSEAL,
SEISMIC COLORSEAL,
DSM SYSTEM,
HORIZONTAL COLORSEAL,
BACKERSEAL,
DSH SYSTEM,
20H SYSTEM, and
25V
 |
Please note: On single orders for a
large quantity of sticks (100+
sticks) lead times may be longer than average. Please plan accordingly
or call
1-800-526-8365 (508-836-0280) for a specific quote). |
*double-sided coated products
SEISMIC COLORSEAL DS, COLORSEAL-DS, DSM-DS, are running about 7
business
days ex-factory and custom colors as short as one week and up to two-weeks.
Parking and plaza deck and in-stock Interior Floor products
are averaging
5.0
business days
ex-factory and depends on the model, quantity,
number
of factory-fabricated transitions on the order and on the receipt of all
information including approved fabrication drawings as necessary.
These include:
THERMAFLEX,
MIGUTAN,
MIGUTRANS,
FN/FTN SURFACE MOUNTED,
BG SYSTEM
SJS SYSTEM
is running about 2-3 weeks (check with us).
|